| SALIENT FEATURES AND
DATA OF UJJANI DAM |
|
|
|
| 1- |
Name of Project |
:: |
Ujjani (Bhima) Project |
|
| 2- |
Name of Dam. |
:: |
Ujjani Dam. |
|
| 3- |
Year of Completion |
:: |
June 1980 |
|
| 4- |
Purpose |
:: |
Irrigation
purpose, with additional purpose of |
|
| |
|
|
Hydro power & drinking water supply. |
|
|
| 5- |
District Benefitted
Give Names of |
:: |
Solapur. |
|
| |
Towns in case of water supply dams. |
|
|
|
| 6- |
Location of Dam. |
|
|
|
| |
I) Topo sheet No. |
:: |
47 N/4, |
|
| |
ii) Latitude |
:: |
180 04,
24 " N |
|
| |
iii) Longitude |
:: |
750 07'
15 " E |
|
| |
iv) District |
:: |
Solapur |
|
| |
v) Taluka |
:: |
Madha |
|
| |
vi) Town or Village |
:: |
Ujjani |
|
| 7- |
Size classification indicate Whether |
:: |
Major |
|
| |
it is a Major, Medium
or Minor |
|
|
|
| |
Irrigation Dam. |
|
|
|
| 8- |
Names of other large dams on the |
:: |
Ghod, Visapur, Kikadi, Chaskaman, Pavana |
|
| |
Immediate Upstream. |
|
Tata Hydro, Verasgaon, Panset, Khadakwasla |
|
| 9- |
Access to Dam site. |
|
|
|
| |
I) Rail Route |
|
|
|
| |
(a) Nearest Railway
Station |
:: |
Kurduwadi Station. |
|
| |
(b) Railway section
& Zone |
:: |
Solapur Section Central. |
|
| |
ii) Road |
:: |
2 Km. from
N.H. No.9 at Km.No. 150 from |
|
| |
( Give details of
access roads upto |
|
Pune & 100 Km. from Solapur & 60 Km. from |
|
| |
off take from a prominent road.) |
|
Pandharpur. |
|
| |
|
|
|
|
| 10- |
River valley (Source of water ) |
|
|
|
| |
I) Name of Stream. |
:: |
Bhima River |
|
| |
ii) Name of Sub basin. |
:: |
Bhima Basin |
|
| |
iii)Name of Main basin. |
:: |
Krishna Basin |
|
| |
|
|
|
|
| 11- |
Catchment Area |
|
Sq. Kms. Sqm.Mles |
|
| |
I) Gross |
:: |
14856
5736 |
|
| |
ii) Free |
:: |
9766
3770 |
|
| |
|
|
|
|
| 12- |
Availability of Hydrological data. |
:: |
From
July 79 (Wangi & Bhigvan rain gauge |
|
| |
|
|
station ) |
|
| |
I) Period of rainfall. |
:: |
From July 78 (Ujjani rain gauge station ). |
|
| |
|
|
|
|
| |
ii) Period of river gauge data with |
:: |
1/6/72 to 7/8/80 Hingangaon River gauging |
|
| |
details of site. |
|
station on D/S of Ujjani Dam. |
|
| |
|
|
|
|
| 13- |
Average annual rainfall in mm near |
:: |
500 mm. |
|
| |
the dam site. |
|
|
|
| 14- |
Yield and Utilization. |
|
|
|
| |
I) Dependability
adopted for design. |
:: |
75 % dependable run off. |
|
| |
|
|
|
|
| |
ii) Yield from the
catchment |
|
|
|
| |
corresponding to above |
|
|
|
| |
dependability. |
|
|
|
| |
a) Total annual Yield. |
:: |
7585 mm3 |
|
| |
b) Upstream
Utilization. |
:: |
3350 mm3 |
|
| |
c) Available Yield. |
:: |
4235 ( 7585 - 3350
) mm3 |
|
| |
d) Net Annual
Utilisation. |
:: |
1878 ( including evaporation
Lossess) mm3 |
|
| |
|
|
|
|
| 15- |
Storage Planning. |
|
MM3
Mcft. |
|
| |
I) Gross Storage
Capacity |
:: |
3320 117244.80 |
|
| |
ii) Live Storage |
:: |
1517.20 53579.11 |
|
| |
iii)Dead Storage |
:: |
1802.80 63665.69 |
|
| |
iv) Carry over. |
:: |
84.90 2998.22 |
|
| |
v) Surcharge Storage between MWL |
:: |
259.42 9161.34 |
|
| |
and FRL. |
|
|
|
| |
|
|
|
|
| 16- |
Flood discharge at the dam site. |
|
Flood Discharge in |
|
| |
|
|
Cumecs Cusecs |
|
| |
I) Maximum observed |
:: |
8720 307903 |
|
| |
data may be given
if available. |
|
14.7.61 |
|
| |
ii) Inglis Flood |
:: |
15,010 530000 |
|
| |
iii)Probable Maximum Flood
|
:: |
22656 800000 |
|
| |
iv) Spill way Design Flood ( @ FRL) |
:: |
15,010 530000 |
|
| |
|
|
|
|
| 17- |
Controlling level of the Dam. |
|
Reduced level in |
|
| |
|
|
Metres Feet |
|
| |
I) Top of dam Mesonry |
:: |
501.40 |
|
| |
Earthen |
:: |
499.87 |
|
| |
ii) Maximum Water
Level ( MWL ) |
:: |
497.58 |
|
| |
iii) Full Reservoir
Level ( FRL ) |
:: |
496.83 |
|
| |
iv) Spillway Crest. |
:: |
490.83 |
|
| |
v) Minimum draw down
level(MDDL) |
:: |
491.03 |
|
| |
vi) Irrigation outlet
sill |
|
|
|
| |
a) Left Bank Canal. |
:: |
487.20 |
|
| |
b) Right Bank Canal. |
:: |
Offtaking in Km. No. 20 of U.L.B.C. |
|
| |
vii) Power Outlet sill. |
:: |
483.32 m. |
|
| |
viii)River sluice |
:: |
470.00 |
|
| |
a) Left Bank Canal. |
:: |
4 Nos. Provided in Spillway portion. |
|
| |
b) Right Bank Canal. |
:: |
--- |
|
| |
ix) Lowest River bed. |
:: |
458.17 |
|
| |
x) Deepest foundation level |
:: |
446.05 m. (for masonary portion in the gorge) |
|
| |
(give
stripping level & cut-off trench |
|
|
|
| |
bed level for earth dams in gorge) |
|
|
|
| |
|
|
|
|
| 18- |
Length of dam in metres |
|
|
|
| |
I) Total Length of
Dam. |
:: |
2534 m. (Ch. 600 to 3134 M. ) |
|
| |
ii) Earth Dam. |
|
|
|
| |
a) Total Length |
:: |
1626 Mtr. |
|
| |
b) Left Flank |
:: |
297 m. Ch.600 to 897 m. ) |
|
| |
c) Right Flank. |
:: |
1329 m.Ch. 1805 to 3134 m.) |
|
| |
iii) Masonary N.O.F. Portaion |
|
|
|
| |
a) Total Length |
:: |
312 |
|
| |
b) Left Flank |
:: |
226 m. Ch. 894.89 to 1120.45 |
|
| |
c) Right Flank. |
:: |
86 Mtr.( Ch. 1722.45 to 1808.29) |
|
| |
iv) Masonary O.F. portion |
:: |
602 M. (Ch. 1120.45 to 1722.45) |
|
| |
If the portion is provided in more than one |
|
|
|
| |
Locations and
types, give lengths |
|
|
|
| |
and details of each seperately. |
|
|
|
| |
|
|
|
|
| 19- |
Spillway Details |
|
|
|
| |
I) Type of Spillway |
:: |
Ogee shaped with redial
Gate |
|
| |
ii) Method of Design
Flood. |
|
By empirical formula with Inglis. |
|
| |
If the design is based
on any |
|
Flood as below. |
|
| |
empirical formula please state the |
|
|
|
| |
same with relevent constant. |
:: |
Q = 7000 A here = A=5736
Sq.Mile |
|
| |
|
|
VR + 4 |
|
| |
|
|
= 530000
Cusecs( 15000 Cumecs) |
|
| |
|
|
|
|
| |
iii) Total Length |
:: |
602 M. |
|
| |
iv) Head Over the crest |
|
|
|
| |
A) @ FRL |
:: |
6.00 M. |
|
| |
B) @ MWL |
:: |
6.75 M. |
|
| |
v) Flood discharges |
|
|
|
| |
A) At FRL |
:: |
15717 Cumecs 555041 Cusecs. |
|
| |
B) At MWL |
:: |
18000 Cumecs 635665 Cusecs. |
|
| |
vi) Details of gates |
|
|
|
| |
A) Type |
:: |
Radial Gates. |
|
| |
B) Size |
:: |
12 x 6.5 mtr. |
|
| |
C) No of gates. |
:: |
41 Nos. |
|
| |
vii) Flood discharging capacity |
:: |
No, breaching section previded however 5000 |
|
| |
of breaching
section if any at MWL |
|
cumecs
(assumed at the junction of earthen |
|
| |
|
|
& Masonry protation.) |
|
| |
viii) Enegry dissipation arrangements. |
|
|
|
| |
A) Type |
:: |
Slotted roller bucket. |
|
| |
B) Low level
bucket. |
:: |
Length 239.25 M @
Invert R.L.453.84 |
|
| |
|
|
against 16 gates outflow @ FRL 5750 & |
|
| |
|
|
MWL 7090 Cumeces. |
|
| |
C) High level
bucket. |
:: |
Length-366 M @ Invert RL 460 .00 against |
|
| |
|
|
25 gates out flow @ FRL 8975 & at MRL |
|
| |
|
|
10910 Cumecs. |
|
| 20- |
Irrigation Outlets. |
|
Left Bank |
|
| |
i) Location Chainage. |
:: |
Ch. 953.70 to 982.30 m. |
|
| |
ii) Type of intake
structure. |
:: |
Conduits rectargular with slab on top. |
|
| |
iii) Outlet sill
level. |
:: |
487.20 M. |
|
| |
iv) Operating head. |
|
|
|
| |
A) Maximum |
:: |
6.23 m. |
|
| |
B) Minimum |
:: |
0.33 m. |
|
| |
v) Maximum design
discharge. |
:: |
109 Cum. / Sec. |
|
| |
vi) No of Openings. |
:: |
5 Nos. |
|
| |
vii) Size of service gates. |
:: |
3 m. x 3.5 m. |
|
| |
viii)Design capacity of each outlet. |
:: |
27.325 Cumecs. |
|
| |
ix) Size of emergency gates. |
:: |
3 m. x 3.5 m. |
|
| |
x) Type of operating
arrangements |
:: |
E.O.T. crane on the gantry. |
|
| |
for emergency
gate. |
|
|
|
| |
xi) Conduit |
|
|
|
| |
A) Type |
:: |
Rectangular |
|
| |
B) Size |
:: |
3.0 x 3.5 m. |
|
| |
C) Length. |
:: |
5.25 m. |
|
| |
xii) Type of energy dissipation |
:: |
Stilling Basin. |
|
| |
arrangements. |
|
|
|
| |
|
|
|
|
| 21- |
Power Outlet. |
|
|
|
| |
I) Location |
:: |
Ch. 1880 m.@ left Bank. |
|
| |
ii) Type of intake |
:: |
R.C.C. frame structure |
|
| |
iii) Outlet sill level. |
:: |
483.32 m. |
|
| |
iv) Operating Head. |
|
|
|
| |
A) Maximum |
:: |
36.77 m. |
|
| |
B) Minimum |
:: |
25.60 m. |
|
| |
v) Design discharge. |
:: |
44 Cumes. |
|
| |
vi) No of Openings. |
:: |
One. |
|
| |
vii) Size of Service gates. |
:: |
-- |
|
| |
viii) Type of
operating arrangement for |
:: |
Under finallsation. |
|
| |
service gates. |
|
|
|
| |
ix) No of emergency
gates. |
:: |
One No. |
|
| |
x) Type of operating
arrangement for |
:: |
Under finallsation. |
|
| |
emergency. |
|
|
|
| |
xi) No and size of
trashracks. |
:: |
15 Nos. of 3.8 x 6.0 m. |
|
| |
xii) No & size of penstocks. |
:: |
One No. of 3.2 M dia. |
|
| |
xiii)Thickness of steel. |
:: |
12 mm. |
|
| |
iv) Length of
penstocks. |
:: |
70 Mtrs. |
|
|
|
|
|
| 22- |
Power Generation. |
|
|
|
| |
I) Location &
Type of Power |
:: |
At the foot of Ujjani Dam
60 m. from the Axis |
|
| |
House structure. |
|
of Dam. circular
type power house |
|
| |
ii) Installed
capacity. |
:: |
12 MW. |
|
| |
iii) Plant load factor |
:: |
20% |
|
| |
iv) No & size of Units |
:: |
One No. |
|
| |
v) Annual Units
generated |
:: |
105 Mus in initial
stage & |
|
| |
|
|
21 Mus the final stage. |
|
| |
vi) Type of turbincs |
:: |
Vertical shaft frances type reversible Pump |
|
| |
|
|
turbine. |
|
| |
|
|
|
|
| 23- |
Canal and Command. |
|
Left Bank Right Bank |
|
| |
I) Length of Canal. |
:: |
126 112 |
|
| |
|
|
( Plus Branches ) |
|
| |
ii) Full supply
discharge at head |
:: |
109 Cumecs 42. 5
Cumecs. |
|
| |
iii) Canal Section at head. |
|
|
|
| |
a) Bed Width |
:: |
24 m 10.50 |
|
| |
b) Full Supply Depth |
:: |
3.75 m 3.25 |
|
| |
c) Valocity of Flow |
:: |
1 Mtr / Sec. 1 Mtr / Sec. |
|
| |
d) Type of Lining. |
:: |
Insitu concrete Lining. |
|
| |
e) Coefficient of regosity |
:: |
0.02 0.02 |
|
| |
iv) Command Area. |
|
Total |
|
| |
1) a) ( Gross C.A.) |
:: |
95608 Ha. 61252 Ha. 156860 Ha. |
|
| |
b) Culturable ( C.C.A.) |
:: |
76480 Ha. 49000 Ha. 125488 Ha. |
|
| |
c) Irrigable (ICA) |
:: |
68840 Ha. 44100 Ha. 112940 Ha. |
|
| |
2) Extention. (ICA) |
:: |
27160 Ha. 7700 Ha. 34860 Ha. |
|
| |
|
|
|
| 24- |
River sluice |
|
|
|
| |
I) Location. |
:: |
Spillway pier No. 3, 4, 5 & 6 |
|
| |
ii) Type of intake |
:: |
Conduit with bell
moouth entry |
|
| |
iii) Outlet sill level |
:: |
470.00 M. |
|
| |
iv) Operating head. |
|
|
|
| |
A) Maximum |
:: |
21 Mtrs. |
|
| |
B) Minimum |
:: |
-- |
|
| |
v) Maximum discharge capacity |
:: |
60 Cumecs / Opening. |
|
| |
vi) Gates. |
:: |
Energy Gates Service Gates |
|
| |
A) Type |
:: |
Vertical Lift
scre type vertical lift |
|
| |
|
|
|
|
| |
B) No & Size. |
:: |
4 No. 1.80m. x 2.70m.
4 Nos. 1.80m x 2.70 m. |
|
| |
C) Type of
Operating arrangement |
:: |
E.O.T. Crane errected on Gantry Structure. |
|
| |
|
|
|
|
| |
vii) Conduit |
|
|
|
| |
A) Type |
:: |
Rectangular Box |
|
| |
B) No & Size. |
:: |
4 Nos. L = 26.689 m. with |
|
| |
|
|
= 1.80m x 2.70 m Box. |
|
| |
viii) Types of
energy dissipation |
:: |
Low level bucket with slotted roller bucket. |
|
| |
arrangements. |
|
|
|
| |
|
|
|
|
| 25- |
Instrumentation
provided indicate |
|
|
|
| |
number of instruments of each type |
|
|
|
| |
and chainage of cross section where |
|
|
|
| |
provided. |
|
|
|
| |
A) Earth Dam. |
:: |
Cesagrande type piezometers 10 Nos. @ |
|
| |
|
|
Ch. 2400
m. & Ch. 2450 m. of earthen dam |
|
| |
|
|
on D/S. |
|
| |
B) Masonry |
:: |
1) Reistance thermometers 17 Nos. @ |
|
| |
|
|
Ch. 1377 m. |
|
| |
|
|
2) Conventional plump bob 1 No. @ |
|
| |
|
|
Ch. 1385.12 m. |
|
| |
|
|
3) Water stage recorder 1 No. @ |
|
| |
|
|
Ch. 1110 m. |
|
| |
|
|
4) U.P. Cells 22 Nos. @ |
|
| |
|
|
Ch. 1193.40, 1340.76, 1642.50 & 1731.00 m. |
|
| |
|
|
5) Piezometers 4 Nos. @ |
|
| |
|
|
Ch. 1193.74 & 1340.76 |
|
| |
|
|
6) Wave height wind speed & wind direction |
|
| |
|
|
recorder each one. |
|
| |
|
|
Temp. installed @ Ch. 1030 m. |
|
| |
C) General |
|
|
|
| |
( Hydrology, Seismicity etc. ) |
:: |
Raingauge stations 3 Nos. ( Seasonal) |
|
| |
|
|
|
|
| 26- |
Volume contents of Dam in / Mcm/ |
|
|
|
| |
I) Earth work |
:: |
1.125 M. Cum. |
|
| |
ii) Masonary |
:: |
0.542 M.Cum. |
|
| |
iii)Concrete. |
:: |
0.120 M. Cum. |
|
| |
|
|
|
|
| 27- |
Total cost of Project. |
|
|
|
| |
I) Dam. |
:: |
6191.39 Lakhs ( I.
Head Work ) |
|
| |
ii) Canals. |
:: |
25134.58 Lakhs ( II Main Canal ) |
|
| |
iii)Power including water conductor |
:: |
1632.50 Lakhs. |
|
| |
system generating
plant etc. |
|
|
|
| |
iv) Total cost |
:: |
32,958.47 Lakhs |
|
| |
Indicate whether
the cost is as per |
|
As per revised project estimate ( 1983-84) |
|
| |
project
Report administrative approval or |
|
|
|
| |
complated
construction. |
|
|
|
| |
|
|
|
|
| 28- |
Communication and other facilities |
|
|
|
| |
available at the dam. |
|
|
|
| |
I) Wireless |
:: |
Temporarily available during Mansoon period. |
|
| |
ii) Telephone |
:: |
Yes. |
|
| |
Indicate name of exchange |
|
Tembhurni 02183/36054, 36014 |
|
| |
and number. |
|
|
|
| |
|
|
|
|
| 29- |
Strengthening and remedical measures |
:: |
Remedial
measures to the Low bucket has |
|
| |
to the Dam and anxillary works. |
|
been carried out during the year 1980 , |
|
| |
|
|
1985 & 1986. |
|
| |
|
|
|
|
|
|
|
|
| |
Details of all strengthening and Major |
|
|
|
| |
repairs for rectifications of servers |
|
|
|
| |
dificiencies accidents etc. may be |
|
|
|
| |
indicated. |
|
|
|
| |
|
|
|
|
| 30- |
Additional information. |
|
|
|
| |
|
|
|
|
| |
I- Dam. |
|
|
|
| |
|
|
|
|
| |
1) Max height of Dam
above the Lowest |
:: |
56.40 Mtr. |
|
| |
point of
foundation. |
|
|
|
| |
2) Height of Dam above
the Lowest |
:: |
43.23 Mtr. |
|
| |
River bed. |
|
|
|
| |
3) Height of Dam above the Dam |
:: |
10.57 Mtr. |
|
| |
above the crest of
the spillway. |
|
|
|
| |
4) Max. width at
foundation |
:: |
46.23 Mtr. |
|
| |
5) Width at top. |
:: |
6.70 Mtr. |
|
| |
6) Drainage gallery |
|
|
|
| |
a) Length |
:: |
Ch. 1011 to 1808 M-797
Mtr. |
|
| |
b) Size |
:: |
1.52 x 2.29
M. |
|
| |
c) Cross galleries |
:: |
4 Nos. |
|
| |
d) Toe gallery |
:: |
2 Nos. |
|
| |
e) Audit gallory. |
:: |
3 Nos. |
|
| |
II) Reservoir. |
|
|
|
| |
a) Area @ MWL |
:: |
357 MM2 |
|
| |
b) Area @ FRL |
:: |
336.50 MM2 |
|
| |
c) Max Length |
:: |
134 Km. |
|
| |
d) Max Width |
:: |
8 Km. |
|
| |
e) Length of
periphery. |
:: |
670 Km. |
|
| |
|
|
|
|
| |
1- Submergence at
F.R.L. |
:: |
Private and 26750
Hectors. |
|
| |
|
|
Govt. and 2250
Hectros. |
|
| |
|
|
|
|
| |
2- No. of villages
affected. |
:: |
1- Londs 80
Nos. |
|
| |
|
|
2- Goathans 52
Nos. |
|
| |
|
|
|
|
| |
3- Diversions |
|
|
|
| |
|
|
|
|
| Sr.No. |
Perticulars |
|
Length
under | Length of |
|
| |
|
|
Submergence
| Diversion. |
|
| |
|
|
|
|
| 1- |
Railway ( Dhound
Solapur Section ) |
:: |
34.466 33.251 |
|
| |
|
|
|
|
| 2- |
N. H. No.9 (Pune -
Solapur Road ) |
:: |
16.00 23.40 |
|
| |
|
|
|
|
| 3- |
State Highway (Tembhurni Karmala Road) |
:: |
3.20 15.35 Km. |
|
| |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|